Skip to main content

Filter by Industry

Regulated Enterprise

RAG Copilot Implementation for Policy & Compliance Research

Client: Top-10 U.S. enterprise (risk & compliance division)

The client needed to streamline policy interpretation, evidence gathering, and internal knowledge lookup across multiple governance frameworks. Manual processes were time-consuming and error-prone, with reviewers spending significant time searching, cross-referencing, and documenting decisions.

75% TIME SAVED
40% ACCURACY IMPROVEMENT
90% ADOPTION RATE
Read Case Study
Media

Agent Automation for Media Content Operations

Client: Global Media Network

Content review and approval workflows were manual and slow, creating bottlenecks in content production pipelines. Content teams spent 40% of their time on review and approval tasks.

60% faster PRODUCTION SPEED
50% reduction REVIEW TIME
25% improvement CONTENT QUALITY
Read Case Study
Regulated Enterprise

LLMOps Foundation for Enterprise AI Platform

Client: Fortune 500 enterprise

Multiple AI applications lacked centralized monitoring, evaluation, and governance, making it difficult to ensure reliability and compliance. Incidents were frequent and deployments were slow due to manual processes.

99.9% UPTIME
80% INCIDENT REDUCTION
3x faster DEPLOYMENT SPEED
Read Case Study
Regulated Enterprise

Production-Grade LLMOps Infrastructure

Client: Enterprise AI Platform (Ishtar AI Case Study)

Building production-ready LLM infrastructure requires careful hardware selection, cost optimization, and scalable deployment patterns. Traditional infrastructure approaches don't account for LLM-specific requirements like GPU partitioning, token economics, and hybrid cloud deployments.

60% DEPLOYMENT TIME REDUCTION
40% reduction COST OPTIMIZATION
99.95% UPTIME
15 minutes INFRASTRUCTURE PROVISIONING
Read Case Study
Regulated Enterprise

Continuous Evaluation & CI/CD for LLM Systems

Client: Enterprise AI Platform (Ishtar AI Case Study)

LLM systems require continuous evaluation to catch regressions and hallucinations, but traditional CI/CD pipelines don't account for non-deterministic model behavior. Deployments were risky without proper evaluation gates, leading to production incidents.

95% REGRESSION DETECTION
80% improvement DEPLOYMENT CONFIDENCE
50% RELEASE CYCLE REDUCTION
90% reduction PRODUCTION INCIDENTS
Read Case Study
Regulated Enterprise

Advanced Observability & Monitoring for LLM Applications

Client: Enterprise AI Platform (Ishtar AI Case Study)

LLM applications require specialized monitoring beyond traditional application metrics. RAG systems need retrieval-specific metrics, prompt flows require detailed tracing, and quality degradation must be detected before user impact. Existing monitoring solutions lacked LLM-specific capabilities.

70% MTTD REDUCTION
100% OBSERVABILITY COVERAGE
95% ALERT ACCURACY
80% FALSE POSITIVE REDUCTION
50% faster INCIDENT RESOLUTION TIME
Read Case Study
Regulated Enterprise

Scaling LLM Production Systems

Client: Enterprise AI Platform (Ishtar AI Case Study)

Scaling LLM deployments requires sophisticated techniques beyond simple horizontal scaling. GPU partitioning, distributed inference, batching optimization, and capacity planning are critical for cost-effective scaling while maintaining latency SLOs. Traditional scaling approaches don't account for LLM-specific constraints.

3x THROUGHPUT IMPROVEMENT
45% COST PER QUERY REDUCTION
99.9% LATENCY SLO COMPLIANCE
85% average GPU UTILIZATION
60% improvement CAPACITY EFFICIENCY
Read Case Study
Regulated Enterprise

End-to-End LLMOps Implementation

Client: Enterprise AI Platform (Ishtar AI Case Study)

Building a complete, production-ready LLMOps platform requires integrating infrastructure, CI/CD, monitoring, scaling, and governance into a cohesive system. Each component must work together seamlessly to deliver reliable, auditable, and scalable LLM applications.

99.9% PLATFORM UPTIME
80% reduction APPLICATION DEPLOYMENT TIME
3x improvement OPERATIONAL EFFICIENCY
100% AUDIT READINESS
Days vs weeks TIME TO PRODUCTION
Read Case Study